配電柜,又被稱作配電箱、配電盤等,它是集中、切換、分配電能的設(shè)備,在各類電氣系統(tǒng)中起著至關(guān)重要的作用。在進(jìn)行配電柜接線時(shí),有諸多關(guān)鍵注意事項(xiàng)需牢記。Power distribution cabinets, also known as distribution boxes, distribution boards, etc., are devices for concentrating, switching, and distributing electrical energy, and they play a vital role in various electrical systems. When wiring power distribution cabinets, there are many key precautions that need to be kept in mind.
一、前期準(zhǔn)備Preliminary preparation
要充分熟悉配電柜的電氣原理圖與接線圖,備好螺絲刀、剝線鉗等工具,以及規(guī)格相符、質(zhì)量可靠的電線電纜、接線端子等材料。Fully familiarize yourself with the electrical schematic diagrams and wiring diagrams of the power distribution cabinets. Prepare tools such as screwdrivers and wire strippers, as well as wire and cable, terminal blocks and other materials that match the specifications and are of reliable quality.
二、安全防護(hù)Safety protection
接線前務(wù)必切斷上級(jí)電源,懸掛警示標(biāo)識(shí),通過驗(yàn)電確保無電后再操作。施工人員須穿戴好絕緣手套、絕緣鞋等防護(hù)用品,保障自身安全。Before wiring, be sure to cut off the power supply from the upper level, hang warning signs, and only start operations after verifying that there is no electricity through electrical testing. Construction personnel must wear protective articles such as insulating gloves and insulating shoes to ensure their own safety。
三、線纜處理Cable handling
依據(jù)各回路負(fù)載電流合理選擇電線電纜線徑,用剝線鉗剝除絕緣外皮時(shí)小心別傷導(dǎo)線,剝線長度適中。同時(shí),為每根導(dǎo)線套上準(zhǔn)確標(biāo)注編號(hào)、回路名的線號(hào)管,方便后續(xù)維護(hù)。Reasonably select the wire and cable diameters according to the load current of each circuit. When stripping the insulating outer sheath with wire strippers, be careful not to damage the conductors, and the stripping length should be appropriate. Meanwhile, put wire number tubes accurately labeled with numbers and circuit names on each conductor for the convenience of subsequent maintenance.
四、接線要點(diǎn)Key points for wiring
導(dǎo)線與電器元件接線端子連接或相互連接時(shí),要使用壓線鉗等工具壓接牢固,杜絕虛接。布線遵循橫平豎直原則,不同功能線路適當(dāng)分開,保持整齊美觀,嚴(yán)格依照接線圖施工,不可隨意更改。When connecting conductors to the terminal blocks of electrical components or connecting them to each other, use tools such as crimping pliers to make firm crimping connections and avoid virtual connections. The wiring should follow the principle of being horizontal and vertical. Different functional lines should be properly separated to keep them neat and beautiful. Strictly follow the wiring diagrams during construction and do not make arbitrary changes.
五、接地與絕緣Grounding and insulation
配電柜金屬外殼要可靠接地,保證接地電阻符合標(biāo)準(zhǔn)要求。接線完畢后,用絕緣電阻表檢測(cè)線路相間、相對(duì)地的絕緣情況,確保絕緣良好,無漏電風(fēng)險(xiǎn)。The metal shells of power distribution cabinets should be reliably grounded to ensure that the grounding resistance meets the standard requirements. After the wiring is completed, use an insulation resistance meter to test the insulation conditions between phases and between conductors and the ground to ensure good insulation and no leakage risk.
六、檢查測(cè)試Inspection and testing
接線完成后,對(duì)照接線圖全面自查,改正錯(cuò)誤。在恢復(fù)供電前,測(cè)試各回路通斷及控制回路動(dòng)作、保護(hù)裝置功能等,確認(rèn)配電柜能正常投入使用。After the wiring is completed, conduct a comprehensive self-inspection against the wiring diagrams and correct any errors. Before restoring the power supply, test the on-off status of each circuit, the actions of the control circuits, the functions of the protection devices, etc., to confirm that the power distribution cabinets can be put into normal use.
聯(lián)系人:劉紹民
手機(jī):15205288168
電話:0511-88136688
傳真:0511-88131655
網(wǎng)址:www.glnc.com.cn
地址:江蘇省揚(yáng)中市經(jīng)濟(jì)開發(fā)區(qū)港隆路36號(hào)
一家專業(yè)從事高低壓電器成套、高低壓母線與橋架設(shè)備研制、開發(fā)、生產(chǎn)、銷售與一體的企業(yè)